chaingpt-claude-skill

mcp
Security Audit
Fail
Health Warn
  • License — License: MIT
  • Description — Repository has a description
  • Active repo — Last push 0 days ago
  • Low visibility — Only 5 GitHub stars
Code Fail
  • fs module — File system access in .github/workflows/smoke.yml
  • process.env — Environment variable access in examples/js/audit-contract.js
  • process.env — Environment variable access in examples/js/chatbot-stream.js
  • network request — Outbound network request in examples/js/dex-swap-preflight.js
  • process.env — Environment variable access in examples/js/fetch-news.js
  • network request — Outbound network request in examples/js/fetch-news.js
  • process.env — Environment variable access in examples/js/nft-generate-mint.js
  • process.env — Environment variable access in examples/js/research-token-and-audit.js
  • network request — Outbound network request in examples/js/research-token-and-audit.js
  • Hardcoded secret — Potential hardcoded credential in examples/js/research-token-and-audit.js
Permissions Pass
  • Permissions — No dangerous permissions requested

No AI report is available for this listing yet.

SUMMARY

Turn Claude Code into a custody-free Web3 co-pilot: 112 MCP tools spanning ChainGPT AI (chat, NFT, contract-gen, audit, news), EVM + Solana DEX & DeFi, perps, prediction markets, cross-chain bridging, and a prompt-injection-resistant agent wallet. 45+ audited Solidity patterns, 10 project templates.

README.md
ChainGPT

ChainGPT Developer Kit for Claude Code

Turn your AI assistant into a Web3 engineering co‑pilot.

One install gives Claude Code 129 MCP tools across ChainGPT AI products (chat, NFT, contract gen, audit, news), EVM + Solana DEX trading (OpenOcean, 1inch v6, CoW, Jupiter), DeFi (Aave V3, Lido, EigenLayer, Pendle, Morpho, Marginfi, Kamino), perps (Hyperliquid + Drift), prediction markets (Polymarket), cross‑chain bridging (Across), x402 agentic payments, Base (Basenames + Mini App scaffolding), ERC‑8004 trustless‑agent identity, multi‑protocol portfolio, strategy plan persistence + backtest, and an agent wallet with localhost admin dashboard + prompt‑injection‑resistant policy gate. Custody‑free. 45+ audited Solidity patterns. 10 project templates. Daily live‑API smoke CI.

npm version
License: MIT
Tests
MCP Tools
Claude Code
TypeScript
PRs Welcome

Quickstart · Why this exists · How it works · Security model · MCP tools · Agent Wallet · vs alternatives · Docs



⚡ Quickstart — full step‑by‑step

This walkthrough takes you from zero to a running dashboard. Estimated time: 5 minutes (most of it Claude Code's first‑run download).

Step 1 — Install Claude Code

Claude Code is Anthropic's official CLI. If you already use it (you see the ▗ ▗ ▖ ▖ banner when you type claude in your terminal), skip to Step 2.

macOS / Linux:

curl -fsSL https://claude.ai/install.sh | bash

Follow the prompts. The installer drops a claude binary in your PATH.

Windows: download the installer from https://code.claude.com/download.

Verify:

claude --version
# → Claude Code v2.1.x

You also need an Anthropic account / Claude subscription — the installer walks you through claude login on first run.

Step 2 — Add the ChainGPT marketplace

Adding a marketplace just tells Claude Code "this GitHub repo is a place I can install plugins from." It does not install anything yet.

Open Claude Code (claude in your terminal). Inside the prompt, paste:

/plugin marketplace add ChainGPT-org/chaingpt-claude-skill

You'll see: ✓ Successfully added marketplace: chaingpt-claude-skill.

Behind the scenes Claude Code:

  1. Reads .claude-plugin/marketplace.json from the repo root.
  2. Clones the repo to ~/.claude/plugins/marketplaces/chaingpt-claude-skill/.
  3. Caches the plugin listing.

[!NOTE]
The reason /plugin install <owner/repo> (single‑step) does not work here is that GitHub's <owner/repo> shorthand resolves only against Anthropic's curated public marketplace, and this plugin isn't (yet) listed there. The two‑step custom‑marketplace flow works today with no approval required.

Step 3 — Install the chaingpt plugin

Type in the Claude Code prompt:

/plugin

A picker opens listing available marketplaces and their plugins. Pick chaingpt-claude-skillchaingpt → press Enter to install.

You'll see: ✓ Installed chaingpt. Run /reload-plugins to apply.

[!TIP]
Shortcut if you don't want to use the picker: /plugin install chaingpt@chaingpt-claude-skill (one shot, no picker).

Step 4 — Reload plugins

Same Claude Code session:

/reload-plugins

This re‑scans installed plugins, spawns the ChainGPT MCP server over stdio, and registers all 22 sub‑skills + 129 MCP tools.

Alternative: quit Claude Code (/quit or Cmd+Q) and relaunch. Plugins are loaded at startup.

Step 5 — Set your API key (optional but recommended)

Without an API key, the dashboard works, all the on‑chain tools work (DEX swaps, Aave, Hyperliquid, etc. — they hit public endpoints), but the ChainGPT product tools fail (chat, NFT generation, contract audit, news — these need credits).

Drop this in your shell rc (~/.zshrc or ~/.bashrc):

export CHAINGPT_API_KEY="your-key-here"   # https://app.chaingpt.org → API Dashboard

Reload your shell (source ~/.zshrc) and re‑launch Claude Code.

Get a key + credits at https://app.chaingpt.org. 1,000 credits = $10. 15 % bonus if you pay in $CGPT.

[!IMPORTANT]
Using Solana DeFi tools? (Marginfi deposit/withdraw, Jupiter swaps, Drift, Kamino.) Set a real Solana RPC — the default public endpoint rate‑limits the heavy on‑chain SDK fetches these tools rely on, so they'll be slow or fail. A free Helius / Triton / QuickNode endpoint is plenty:

export SOLANA_RPC_URL="https://your-solana-mainnet-rpc-url"

EVM tools don't need this — they ship with public‑RPC fallbacks per chain.

Step 6 — Verify it works

In a fresh Claude Code session:

/mcp

You should see chaingpt listed with 129 tools.

Step 7 — Open the dashboard

/chaingpt:dashboard

Claude calls the chaingpt_dashboard_serve MCP tool. It prints:

URL:         http://127.0.0.1:8788
Admin token: <48-char hex>

Open the URL in your browser. The login page asks for the admin token — paste it, click Unlock. You land on the Overview tab.

6 tabs available:

Tab What it shows
Overview Plugin / MCP / marketplace versions, skill count, agent‑wallet init status
Wallet Agent EOA address, policy summary (kill switch, allowed chains, max value), tracked assets, link to launch the full Wallet Admin UI for editing
Skills Card per sub‑skill with description from each SKILL.md
Activity Last 50 signed transactions the agent has executed
Health Which env vars are set (presence only — never values), Node version, key paths
About Plugin metadata + top of CHANGELOG.md

The dashboard binds 127.0.0.1 only, the admin token rotates every time the server (re)starts, and the session cookie is HttpOnly + SameSite=Strict + 1 h TTL. The dashboard is read‑only — signing flows stay in MCP tool calls.

Step 8 — Optional: enable the Agent Wallet (only needed for "bounded autonomous" flows)

If you want Claude to sign and broadcast transactions itself within a policy you set, the Agent Wallet feature ships with the plugin. It's optional — if you just want the AI co‑pilot that returns unsigned transactions for you to sign in MetaMask / Rabby / Phantom, skip this step.

The keystore is AES‑256‑GCM encrypted with a passphrase. You have two ways to provide it:

Option A — zero‑setup (macOS / Linux with a keychain): just init. A strong 256‑bit passphrase is auto‑generated and stored in your OS keychain (macOS Keychain or Linux libsecret). You never type or remember it.

> initialize the agent wallet

Option B — explicit env var (CI / headless / maximum control): set a passphrase before launching Claude Code.

export CHAINGPT_AGENT_WALLET_PASSPHRASE="your-strong-passphrase-min-16-chars"
# then relaunch claude, and: > initialize the agent wallet

Either way, Claude calls chaingpt_agent_wallet_init and prints the new EOA address (and tells you which passphrase source it used). The default policy is now Balanced DeFi (kill switch OFF, 0.1‑native per‑tx cap, major DEX/lending routers allowlisted) — fund the address, review/tighten the policy in the dashboard, and you're set.

Back up the passphrase. Keychain option: security find-generic-password -s chaingpt-mcp-agent-wallet -a keystore-passphrase -w (macOS). Lose it with no backup → the keystore is unrecoverable.

For full wallet management (multi-chain balances, kill switch, 9 policy templates including 🚨 Unrestricted, custom-chain registration, blue-chip auto-scan), open the dedicated wallet admin UI:

> open the wallet admin UI

Claude calls chaingpt_agent_wallet_serve_ui. It prints a URL on http://127.0.0.1:8787 and its own admin token (separate from the dashboard's 8788 token).

Slash commands you'll use most

Command What it does
/plugin Plugin picker — install / uninstall / enable plugins
/plugin marketplace add <owner/repo> Register a custom marketplace
/plugin install <plugin>@<marketplace> One-shot install without the picker
/reload-plugins Re-scan installed plugins; needed after install / update / fork edits
/mcp List active MCP servers and their tool counts — sanity check
/chaingpt:dashboard [port] Open the marketplace dashboard. Optional port arg if 8788 is taken
/plugin marketplace update chaingpt-claude-skill Pull the latest version from GitHub
/quit Quit Claude Code (plugins are loaded at startup, so this is the safe restart)

Troubleshooting

Symptom Fix
Marketplace 'ChainGPT-org/chaingpt-claude-skill' not found You skipped Step 2. Run /plugin marketplace add ChainGPT-org/chaingpt-claude-skill first.
/plugin install ran but no chaingpt server in /mcp You skipped Step 4 (/reload-plugins) or never restarted Claude Code. Plugins load at startup.
Unknown command: /chaingpt:dashboard The plugin isn't installed or wasn't reloaded. Repeat Steps 3 + 4.
Dashboard URL prints but browser shows "can't connect" The dashboard server exited (the demo-test process might have ended). Re-run /chaingpt:dashboard to boot it again.
Dashboard login says "Invalid token" Tokens rotate every time the dashboard starts. Use the most recent token printed by the most recent /chaingpt:dashboard call.
Port 8788 already in use /chaingpt:dashboard 9999 (or any free port).
WARN: CHAINGPT_API_KEY is not set in MCP server logs Optional. The plugin still works; only the ChainGPT product tools (chat / NFT / audit / generator / news) will fail with a clear per-call message. Set the env var if you need those tools.
chaingpt_agent_wallet_init errors with passphrase complaint The CHAINGPT_AGENT_WALLET_PASSPHRASE env var must be set in the same shell that launched Claude Code, with ≥16 chars. Quit Claude Code, export …, relaunch.
Solana DeFi tools (Marginfi deposit/withdraw, Jupiter, Drift) are slow or time out / 429 The default public Solana RPC rate‑limits the heavy DeFi SDK fetches. Set SOLANA_RPC_URL to a real endpoint (Helius / Triton / QuickNode free tier) before launching Claude Code — see Step 5.
Alternative install: git clone (for forking, pinning, or contributing)

If you'd rather pin a specific commit or work from a fork:

# User-level (recommended — applies to every project)
git clone https://github.com/ChainGPT-org/chaingpt-claude-skill ~/.claude/plugins/chaingpt

# Or project-level
git clone https://github.com/ChainGPT-org/chaingpt-claude-skill .claude/plugins/chaingpt

Build the MCP server:

cd ~/.claude/plugins/chaingpt/mcp-server
npm install && npm run build

The plugin's .claude-plugin/plugin.json and .mcp.json are picked up automatically. /reload-plugins in any Claude Code session, then proceed from Step 5.

Alternative install: MCP server only (skip the skills layer)

If you want only the MCP tools — no auto-loaded skills or reference docs — add the server directly to your Claude Code settings:

{
  "mcpServers": {
    "chaingpt": {
      "command": "node",
      "args": ["/absolute/path/to/chaingpt-claude-skill/mcp-server/dist/index.js"],
      "env": { "CHAINGPT_API_KEY": "your-key-here" }
    }
  }
}

You lose the intent-routing sub-skills, reference docs, templates, and patterns this way. Recommended only if you're integrating the MCP server into a non-Claude-Code host.


🎯 Why this exists

Building with Web3 AI APIs means juggling seven different domains in one task: an API surface (ChainGPT), DEX aggregators (OpenOcean / 1inch / CoW / Jupiter), risk scanners (GoPlus / Honeypot), on‑chain readers (Etherscan / Moralis / RPC), DeFi protocols (Aave / Lido / Pendle / Morpho), exchanges (Hyperliquid / Drift / Polymarket), cross‑chain bridges (Across), and the wallet signing that ties them together. Each has its own SDK, schema, error format, key management story, and rate‑limit gotchas. Most of an LLM's time is spent guessing parameters and burning credits on bad calls.

This skill collapses all of that into one toolkit Claude already knows. You describe the goal — "swap 5 ETH on Arbitrum but only if GoPlus says the buy token is safe" — and Claude orchestrates the seven calls, returns the unsigned transaction, and waits for you to sign in your wallet of choice. No SDK installs. No private‑key handoff. No "wait, which version of the OpenOcean API uses gmxV2?" archaeology.

Who it's for

Role What you get from this
Solo Web3 dev Skip the "30 SDKs, 3 docs sites, 12 schema versions" tax. Build a deploy pipeline, an MEV‑protected swap, or a portfolio dashboard from chat.
DeFi power user Health‑factor monitor + automated stake/unstake + cross‑chain rebalance, all custody‑free, no on‑chain bot infrastructure required.
Hackathon team The chaingpt-hackathon skill scaffolds a working 5‑file Web3 + AI project in 60 seconds. 10 templates including multi‑product compositions (NFT Marketplace, DeFi Dashboard).
Quant / desk Hyperliquid + Drift + Polymarket live data, Pendle yield discovery, Morpho vault analytics, strategy plan persistence + grid backtester, all from one toolkit.
Smart‑contract engineer 45+ audited Solidity patterns Claude composes from. Mainnet deploy with mandatory audit gate. Verification via Etherscan v2 across every major EVM chain.
Agent builder The agent gets its own EOA + policy file the LLM cannot bypass. Localhost admin dashboard with 9 policy templates + kill switch. Build "bounded autonomous" trading/yield bots safely.

🧠 How it works

Four cooperating layers. Each does one thing well. Claude routes between them automatically.

┌────────────────────────────────────────────────────────────────────────┐
│                              Claude Code                               │
└───────────────────────────────┬────────────────────────────────────────┘
                                │
        ┌───────────────────────┼───────────────────────┐
        ▼                       ▼                       ▼
┌──────────────────┐  ┌──────────────────┐  ┌──────────────────────┐
│  22 sub-skills   │  │ Reference docs   │  │ Templates + Patterns │
│  (intent → tool) │  │ (19 markdown)    │  │ (11 + 45)            │
│  Triggers route  │  │ Every endpoint   │  │ Production scaffolds │
│  Claude to the   │  │ + param + cost   │  │ + audited Solidity   │
│  right toolkit   │  │ + error code     │  │                      │
└────────┬─────────┘  └──────────────────┘  └──────────────────────┘
         │
         ▼
┌────────────────────────────────────────────────────────────────────────┐
│  MCP Server — 129 tools (the runtime)                                  │
│                                                                        │
│  ChainGPT AI       │  Web3 toolkit    │  Mainnet execution             │
│  • chat / NFT      │  • wallet scan   │  • EVM swap (OO/1inch/CoW)    │
│  • generator       │  • token research│  • Solana swap (Jupiter)      │
│  • auditor         │  • risk scan     │  • deploy + verify            │
│  • news            │  • on-chain read │  • Aave/Lido/EigenLayer       │
│                    │  • AI-enriched   │  • Hyperliquid + Drift        │
│  Agent wallet      │    intel         │  • Polymarket data            │
│  • encrypted EOA   │                  │  • Across bridge              │
│  • policy gate     │                  │  • Pendle + Morpho yield      │
│  • admin dashboard │                  │  • portfolio fan-out          │
│                    │                  │  • strategy plans + backtest  │
└────────────────┬───────────────────────┬──────────────────────────────┘
                 │                       │
                 ▼                       ▼
        ┌─────────────────┐     ┌─────────────────────────┐
        │  Mock Server    │     │  Real upstreams         │
        │  localhost:3001 │     │  (DexScreener, GoPlus,  │
        │  Zero credits   │     │   OpenOcean, Aave,      │
        │  for dev / CI   │     │   Hyperliquid, …)       │
        └─────────────────┘     └─────────────────────────┘

The four layers:

  1. Sub‑skills (skills/*/SKILL.md, 22 of them) — markdown files with YAML frontmatter that Claude Code auto‑routes based on intent. Examples: chaingpt-deploy triggers on "deploy a contract"; chaingpt-trade on "swap"; chaingpt-agent-wallet on "give the agent a wallet." Each sub‑skill bundles the relevant tools, mandatory pre‑flight checks, and links to deeper reference docs.

  2. Reference docs (reference/*.md, 19 files) — every endpoint, parameter, response shape, credit cost, and error code for the seven ChainGPT products. The skill loads these into Claude's context on demand so it never has to guess a parameter name.

  3. Templates + Patterns (templates/ + patterns/, 10 templates + 45+ Solidity patterns) — production‑ready scaffolds (Next.js chatbot, NFT marketplace, DeFi dashboard, React Native wallet, Nuxt news app, …) and audited Solidity (ERC‑20 variants, ERC‑4626 vaults, UUPS upgradeable, Governor, role‑based access, timelocks, …). Claude composes from these instead of regenerating boilerplate from scratch.

  4. MCP Server (mcp-server/, 129 tools) — the runtime. A @modelcontextprotocol/sdk server that exposes every state‑changing capability as an MCP tool. Direct API calls, on‑chain reads via public RPC, custody‑free transaction building. Claude doesn't write code that calls APIs — Claude calls them directly through the MCP layer.

Plus a mock server (mock-server/) — a full drop‑in replacement for the ChainGPT API at http://localhost:3001. Realistic responses, simulated latency, credit tracking. Build and CI without burning a single credit.


🔐 Security model

The single design choice that everything else follows from: the plugin never sees a private key for funds the user controls. Every state‑changing tool builds an unsigned transaction (EVM) or signed EIP‑712 intent (Hyperliquid / Polymarket) and hands it back. You sign in whatever wallet you already trust — MetaMask, Rabby, Trust, Phantom, hardware wallet (Ledger / Trezor via the same flow), WalletConnect, or your own custom signer.

Threat Defense
Drained funds via prompt‑injected "send everything to attacker" The plugin doesn't hold keys for user wallets. The agent wallet (a separate optional feature) has an admin policy gate in code (not in the LLM prompt) that refuses out‑of‑policy txs even under successful prompt injection.
Accidental mainnet broadcast Every state‑changing mainnet tool refuses without acknowledgeMainnet: true. The refusal message lists exactly what to verify.
Unaudited deploy chaingpt_deploy_build_tx requires a prior chaingpt_audit_contract pass on mainnet. The chaingpt-deploy skill enforces the audit step.
Honeypot / rug / sanctioned address chaingpt_risk_token + chaingpt_risk_honeypot + chaingpt_risk_address integrate GoPlus + Honeypot.is. The chaingpt-trade skill makes risk check mandatory before any build_swap_tx.
Leaked API key in source CHAINGPT_API_KEY lives in env only. Daemon paths refuse to start if the env var is missing. CI fails on literal API‑key patterns in source.
Tx replay across chains Every signed payload includes chainId or equivalent (EIP‑712 domain on EVM; chain‑specific addresses on Solana; HL's L1 source byte; Polymarket's CTF domain).

The agent wallet is the one place the plugin can hold a key — but only the agent's own key, encrypted with a passphrase the agent never sees, gated by a policy file the agent has no tool to write. See the dashboard section for the full threat model and admin flow.


🖥️ The Agent Wallet Dashboard

Ships with a real localhost wallet UI for the AI agent — not just a CLI. Encrypted EOA keystore, admin‑controlled policy gate the agent cannot bypass even under prompt injection, kill switch, 9 policy templates including 🚨 unrestricted mode, custom EVM chain registration, blue‑chip auto‑scan.

Agent Wallet admin dashboard — Assets tab

Policy tab — kill-switch banner + 9 one-click templates Activity tab — agent-initiated transactions Settings tab — custom EVM chains + file paths

Launch it locally in 30 seconds:

# 1. Set a strong passphrase (>=16 chars) for the encrypted keystore
export CHAINGPT_AGENT_WALLET_PASSPHRASE="your-strong-passphrase-here-min-16-chars"

# 2. Try the dashboard without touching your real ~/.chaingpt-mcp/ files
node scripts/demo-agent-wallet-dashboard.mjs

Open http://127.0.0.1:8787/. The console prints a one‑time admin token — paste it at the login screen.

Why this is prompt‑injection‑resistant:

  1. Policy lives in a JSON file (~/.chaingpt-mcp/agent-wallet/policy.json). No MCP tool can write it — admin edits via the localhost dashboard or a text editor.
  2. Every sign_and_send call loads the policy file fresh and runs checkPolicy(intent) — pure deterministic code that doesn't see the LLM's context. Refuses if any rule fails (kill switch, chain whitelist, address allow/blocklist, value cap, gas cap, selector blocklist, memo requirement).
  3. The LLM has no MCP tool that issues arbitrary HTTP requests, so it cannot reach the localhost dashboard's edit endpoints either.
  4. Default policy is fail‑closed (killSwitch: true). Admin must explicitly opt in.

Security: bound to 127.0.0.1 only — never 0.0.0.0. Origin + Referer check on every POST. Session cookie HttpOnly + SameSite=Strict + 1h sliding TTL. Admin token rotated on every restart. Atomic write + .bak backup at 0600.


🔌 MCP Server — 129 Tools

The MCP server gives Claude direct API and on‑chain access — not just code generation. 129 tools across 15 categories. Detailed sections follow.

Category Tools Notes
ChainGPT AI products (chat / NFT / audit / generator / news) 18 Core ChainGPT API surface
Web3 toolkit (wallet / research / risk / on‑chain) 14 11 chains incl. Solana
AI‑enriched composed tools 2 DexScreener + GoPlus + ChainGPT news + AI signal in one call
Mainnet contract deployment 5 Custody‑free, mandatory audit gate
Mainnet DEX trading (OpenOcean + 1inch + CoW + Jupiter) 9 Custody‑free
Mainnet DeFi (Aave / Lido / EigenLayer / Pendle / Morpho) 12 Custody‑free, health‑factor gate
Perps (Hyperliquid + Drift) 14 Read‑only on Drift; HL signed EIP‑712 actions
Polymarket prediction markets 6 Read + signed CTF/Neg‑Risk orders
Cross‑chain bridge (Across v3) 3 10 EVM mainnets
Solana lending (Marginfi + Kamino) 8 Reads + custody‑free Marginfi & Kamino deposit/withdraw (mainnet‑verified, simulated)
Solana signing foundation + SPL transfer 2 Custody‑free VersionedTransaction, classic + Token‑2022
ERC‑4337 v0.7 account‑abstraction foundation 4 userOpHash, pack, bundler‑RPC proxy
x402 agentic payments 4 EIP‑3009 X‑PAYMENT builder, facilitator verify/settle, monetize endpoints
Base — Basenames 3 Forward/reverse resolution (mainnet‑verified) + registration tx
Base App / Farcaster Mini Apps 3 farcaster.json manifest, fc:miniapp embed, validation
ERC‑8004 Trustless Agents 3 Agent identity/AgentCard resolution (mainnet‑verified) + card generator
Multi‑protocol portfolio + strategy plans + backtest 6 + 1 One‑shot snapshot across 4 protocols
Agent wallet (encrypted EOA + admin policy gate) 7 LLM cannot bypass policy
Utility (credit estimate, balance) 2
Total 129

x402 agentic payments · Base · ERC‑8004 (13 tools, new in 1.15)

The agent‑economy layer: pay for things autonomously, get a human‑readable identity on Base, and carry a portable on‑chain reputation. All custody‑free.

Tool What it does
chaingpt_x402_decode Decode an x402 402 challenge / X‑PAYMENT header into human terms before paying
chaingpt_x402_build_payment Build the UNSIGNED EIP‑3009 transferWithAuthorization typed data; return the X‑PAYMENT header once signed
chaingpt_x402_facilitator Call a facilitator — supported / verify / settle
chaingpt_x402_create_requirements Generate PaymentRequirements + a 402 body to monetize your own API
chaingpt_base_resolve_name Resolve name.base.eth ↔ address (forward + reverse) — verified live on Base mainnet
chaingpt_base_name_availability Is a Basename available + its price for N years
chaingpt_base_register_name_tx UNSIGNED Basename registration tx (sets addr + reverse record); mainnet gated
chaingpt_miniapp_manifest Generate /.well-known/farcaster.json for a Base App / Farcaster Mini App
chaingpt_miniapp_embed Generate the fc:miniapp (+ legacy fc:frame) share embed meta tag
chaingpt_miniapp_validate Validate a Mini App manifest against the spec
chaingpt_erc8004_resolve_agent Resolve an ERC‑8004 agent → owner + AgentCard — verified live on Base mainnet
chaingpt_erc8004_registries Canonical Identity/Reputation registry addresses (the 0x8004… singletons)
chaingpt_erc8004_agentcard Generate a spec‑compliant registration-v1 AgentCard (incl. x402Support)

x402 settles in USDC on Base via EIP‑3009 — the facilitator can only broadcast the signed authorization, never change the amount or recipient. Basenames + ERC‑8004 reads use a public‑RPC fallback chain; set BASE_RPC_URL for heavy use. ERC‑8004 write/registration is intentionally deferred while the draft EIP's write ABIs stabilize (read + AgentCard scaffolding ship now). See the chaingpt:x402, chaingpt:base, and chaingpt:trustless-agents skills.

ChainGPT AI products (18 tools)

Tool What it does
chaingpt_chat Ask the Web3 AI chatbot — crypto‑native LLM with live on‑chain data
chaingpt_chat_with_context Branded chatbot with company / token context injection
chaingpt_chat_history Retrieve past conversations by session id
chaingpt_nft_generate_image · _enhance_prompt · _generate_and_mint · _get_chains Generate AI art, mint on 22+ chains
chaingpt_audit_contract AI security audit with scored report
chaingpt_generate_contract Natural language → production Solidity
chaingpt_news_fetch · chaingpt_news_categories Crypto news with category + token filters
chaingpt_estimate_credits · chaingpt_check_balance Cost + balance utilities

Web3 toolkit (14 tools)

Across 11 chains: ethereum, base, arbitrum, optimism, polygon, bsc, avalanche, blast, linea, scroll, solana.

Tool What it does Backend
chaingpt_wallet_balances · _positions · _pnl Multi‑chain native + ERC‑20 balances, DeFi positions, realized + unrealized P&L Moralis (opt) + RPC
chaingpt_research_token · _pairs · _trending Price, liquidity, volume, all trading pairs, trending tokens DexScreener
chaingpt_risk_token · _honeypot · _address · _contract_source Honeypot / mintable / proxy flags, buy + sell simulation, sanctions / phishing check, verified source code GoPlus + Honeypot + Etherscan v2
chaingpt_onchain_tx · _address · _gas · _block Decode any tx, recent activity, multi‑chain gas oracle, block info Etherscan v2 + RPC

AI‑enriched composed tools

These are the strategic differentiator — pure aggregation tools wrapped in ChainGPT's AI layer.

Tool What it does
chaingpt_intel_token One call → DexScreener + GoPlus + ChainGPT news + AI signal. The "research this token" tool. ~1 credit.
chaingpt_intel_wallet Portfolio + per‑holding risk rating across chains. Free read.

Mainnet contract deployment (5 tools)

Custody‑free. The plugin builds an unsigned tx; the user signs externally. MAINNET is the default; testnet is opt‑in via the network parameter.

Tool What it does
chaingpt_deploy_compile Solidity 0.8.x → bytecode + ABI + warnings
chaingpt_deploy_estimate Preview gas cost on the target chain
chaingpt_deploy_build_tx Refuses mainnet without acknowledgeMainnet: true
chaingpt_deploy_verify · _verify_status Submit source to Etherscan v2; poll the GUID

Mainnets (default): ethereum · base · arbitrum · optimism · polygon · bsc · avalanche · blast · linea · scroll.
Testnets (opt‑in): sepolia · base‑sepolia · arbitrum‑sepolia · optimism‑sepolia · polygon‑amoy · bsc‑testnet.

The chaingpt-deploy skill enforces the mandatory pipeline: generate → audit → compile → estimate → confirm → build‑tx → user‑signs → verify.

Mainnet DEX trading (9 tools)

Custody‑free. Same acknowledgeMainnet safety pattern.

Tool Backend
chaingpt_dex_quote · _build_swap_tx · _approve_tx OpenOcean v4 (EVM)
chaingpt_dex_jupiter_quote · _jupiter_build_swap_tx Jupiter v6 (Solana)
chaingpt_dex_1inch_quote · _1inch_build_swap_tx 1inch v6 (EVM, key‑gated)
chaingpt_dex_cow_quote · _cow_create_order CoW Protocol (EVM, intent‑based, MEV‑protected)

The chaingpt-trade skill codifies the mandatory pre‑flight: chaingpt_risk_token on the buy token + chaingpt_dex_quote BEFORE any build_swap_tx.

Mainnet DeFi protocols (12 tools)

Custody‑free. chaingpt-defi skill enforces a chaingpt_defi_aave_health check before any borrow / withdraw.

Tool What it does
chaingpt_defi_aave_health · _supply_tx · _borrow_tx · _repay_tx · _withdraw_tx Aave V3 on 7 chains
chaingpt_defi_lido_stake_tx Stake native ETH → stETH on Lido
chaingpt_defi_eigenlayer_deposit_tx Restake stETH / rETH / cbETH on EigenLayer
chaingpt_defi_pendle_markets · _market Pendle yield‑strip discovery — fixed APY, implied APY, YT, maturity
chaingpt_defi_morpho_markets · _vaults · _user Morpho Blue isolated markets + MetaMorpho curated vaults

Aave V3 chains: ethereum, base, arbitrum, optimism, polygon, bsc, avalanche.

Perps — Hyperliquid + Drift (14 tools)

Live mainnet data. Hyperliquid supports signed EIP‑712 L1 actions (custody‑free order placement). Drift is read‑only in this release.

Tool What it does
chaingpt_hl_markets · _mids · _orderbook · _account · _fills · _funding Read HL market data + account state
chaingpt_hl_place_order_payload · _cancel_order_payload · _update_leverage_payload EIP‑712 signed intents — user wallet finalizes
chaingpt_drift_markets · _market · _orderbook · _funding · _user Read Drift perp markets, orderbook, funding, user account

Polymarket prediction markets (6 tools)

Tool What it does
chaingpt_pm_markets · _market · _orderbook · _trades Discover markets + read live data
chaingpt_pm_create_order · _create_neg_risk_order EIP‑712 signed CTF / Neg‑Risk order intents

Cross‑chain bridging (3 tools)

Tool What it does
chaingpt_bridge_quote · _build_deposit_tx · _status Across Protocol v3 across 10 EVM mainnets

Solana lending (4 tools, read‑only)

Tool What it does
chaingpt_defi_marginfi_banks · _account Marginfi v2 banks + user account
chaingpt_defi_kamino_markets · _vaults Kamino markets + automated yield vaults

Portfolio + strategy plans + backtest (7 tools)

Tool What it does
chaingpt_portfolio_snapshot Fan‑out parallel to HL + PM + Morpho + Drift for one user
chaingpt_strategy_dca · _grid · _funding_arb · _copy_trade Strategy template planners
chaingpt_strategy_save_plan · _load_plan · _list_plans · _delete_plan Persist strategy plans to ~/.chaingpt-mcp/plans/
chaingpt_backtest_grid Replay a buy/sell ladder against historical CoinGecko prices; reports realized P&L from grid spreads vs buy‑and‑hold

Agent wallet (7 tools)

See the dashboard section for the threat model and admin flow.

Tool What it does
chaingpt_agent_wallet_init AES‑256‑GCM encrypted keystore, scrypt KDF
chaingpt_agent_wallet_address · _status · _balances · _policy Read‑only views
chaingpt_agent_wallet_sign_and_send Only fund‑moving tool. Policy gate runs deterministically; refuses with reason on any violation.
chaingpt_agent_wallet_serve_ui Start the localhost admin dashboard on 127.0.0.1:8787

Optional API keys

The plugin works without these but unlocks more if present:

Env var Unlocks Get one
MORALIS_API_KEY Full multi‑chain ERC‑20 scan + DeFi positions + P&L https://moralis.io (25k req/month free)
ETHERSCAN_API_KEY Higher Etherscan rate limit (Etherscan v2 covers every major EVM chain) https://etherscan.io/myapikey (free)
ONEINCH_API_KEY 1inch v6 aggregator routing https://portal.1inch.dev

📦 ChainGPT products covered

Product What it does Cost
Web3 AI Chatbot & LLM Crypto‑native LLM with live on‑chain data, Nansen Smart Money, 33+ chains 0.5 credits
AI NFT Generator Text‑to‑image + on‑chain minting across 22+ chains, 4 AI models 1–14.25 credits
Smart Contract Generator Natural language → production Solidity 1 credit
Smart Contract Auditor AI vulnerability detection with scored audit reports 1 credit
AI Crypto News Real‑time AI‑curated news, 24 categories, RSS feeds 0.1 credits
AgenticOS Open‑source autonomous X/Twitter AI agents 1 credit/tweet
Solidity LLM Open‑source 2B‑param model for Solidity code generation Free

Plus SaaS & Whitelabel references — Launchpad, Staking, Vesting, Telegram bots.

1 credit = $0.01 USD · 15% bonus when paying with $CGPT.


📋 10 Project Templates

Template Stack ChainGPT products
Web3 AI Chatbot Express + TypeScript LLM
NFT Minting Service Node.js NFT Generator
Contract Audit CI/CD GitHub Actions Auditor
Crypto News Dashboard Vanilla JS News API
AI Twitter Agent Node.js AgenticOS
NFT Marketplace Next.js + wagmi NFT + LLM + Auditor + News
DeFi Dashboard React + Recharts LLM + News + Auditor
Next.js Chatbot Next.js 14 App Router LLM
React Native Wallet Expo + React Native LLM + NFT
Nuxt News App Nuxt 3 SSR News API

🔐 45+ Smart Contract Patterns

Audited, production‑ready Solidity patterns Claude composes from instead of generating from scratch:

Category Count Examples
ERC‑20 Tokens 10 Basic, burnable, taxable, reflection, governance, multi‑chain
NFTs 10 ERC‑721, 721A, lazy mint, soulbound, dynamic, ERC‑1155, revenue‑sharing
DeFi 10 Staking, vesting, bonding curve, AMM, flash loans, ERC‑4626 vault
Governance 5 Governor, multi‑sig, DAO treasury, delegation
Security 10 Access control, upgradeable (UUPS), timelock, escrow, EIP‑712

💬 Usage examples

Just talk to Claude naturally:

"Build me a Web3 AI chatbot with streaming responses"
"Generate and mint an NFT on Base using ChainGPT"
"Set up smart contract auditing in my CI/CD pipeline"
"Scaffold an NFT marketplace that uses 4 ChainGPT products"
"What's the credit cost for generating 100 NFTs with NebulaForge XL?"
"Write a staking contract"   →  uses patterns library, not from scratch
"I'm migrating from OpenAI — help me switch to ChainGPT"
"I'm at a hackathon — scaffold me a DeFi project fast"

End‑to‑end DeFi flow:

You: "I want to long ETH 5x on Hyperliquid but check the funding rate first.
      If funding is paying shorts, post a limit order at -1.5% from mid."

Claude: → chaingpt_hl_markets
        → chaingpt_hl_funding  (ETH 8h funding rate: -0.0042% → shorts pay longs ✓)
        → chaingpt_hl_orderbook(symbol=ETH, depth=20)  (mid: 4218.5)
        → chaingpt_hl_place_order_payload(symbol=ETH, side=buy, size=5000,
                                          price=4155.2, leverage=5,
                                          tif=Gtc)
        ✓ EIP-712 intent ready. Paste this into your HL signer to broadcast:
        { "action": {...}, "nonce": ..., "signature": "0x..." }

Custody‑free deploy:

You: "Generate an ERC-4626 vault for a yield strategy on Arbitrum,
      audit it, then prepare a mainnet deploy. Don't broadcast."

Claude: → chaingpt_generate_contract(...)
        → chaingpt_audit_contract(...)  (score: 9.2/10 — no critical issues)
        → chaingpt_deploy_compile(...)  (bytecode: 0x60806040..., ABI: [...])
        → chaingpt_deploy_estimate(network=arbitrum)  (estimated cost: 0.018 ETH)
        → chaingpt_deploy_build_tx(network=arbitrum, acknowledgeMainnet=true)
        ✓ Unsigned tx ready. Open MetaMask / Rabby / Ledger and broadcast.
        After confirmation, run:
          chaingpt_deploy_verify(address=…, network=arbitrum)

💰 Pricing & credits

Item Price
1 credit $0.01 USD
Pay with $CGPT 15% bonus credits
Mock server Free, unlimited (http://localhost:3001)
Live‑smoke CI daily run Free (uses public endpoints; ChainGPT‑side calls use a smoke key)
Web3 AI Grant Up to $1,000,000 for projects built on ChainGPT — grant page
Pad Innovation Grant Up to $25,000 for hackathon / pilot projects — grant page

Per‑product credit costs are in reference/pricing.md and chaingpt_estimate_credits returns a quote before you spend.


🧪 Testing

Use the mock server to develop and test without spending a single credit.

The mock server is a full drop‑in replacement for the ChainGPT API — realistic responses, simulated latency, credit tracking — so you can build, iterate, and run CI/CD pipelines without touching your API quota.

cd .claude/skills/chaingpt/mock-server
npm install && npm run dev
# → http://localhost:3001

Point your CHAINGPT_BASE_URL at http://localhost:3001 and everything works exactly as it would in production. No API key required.

Run the full test suite

./scripts/test-all.sh           # everything (offline + live smoke, ~50s)
./scripts/test-all.sh --fast    # everything except live smoke (~20s)
./scripts/test-all.sh --only mcp-test    # one layer only

The orchestrator runs six layers — see TESTING.md for the full reference.

Layer Pass count Network
validate (structural / frontmatter checks) 159 none
typecheck (tsc --noEmit for both servers) clean none
mcp-test (vitest — handlers, policy gate, signing, schemas) 347 none
mock-test (vitest — mock‑server endpoints via supertest) 26 none
examples (node --check + python3 -m ast) every file none
smoke (live mainnet APIs) 39 yes

CI runs the first four on every push and PR (.github/workflows/ci.yml). Smoke runs daily plus on‑demand and opens a labeled GitHub issue on scheduled‑run failure.

The contract: every PR that adds a tool or behavior must add tests in the same PR. See TESTING.md.


📊 How this compares

There are several Web3 + AI agent toolkits in flight. They aim at the same outcome (let an LLM call Web3 surfaces) but pick different trade‑offs.

This skill Goat SDK (Crossmint) Coinbase AgentKit MetaMask Snaps + MCP Heurist
Surface 129 MCP tools across 11 categories incl. perps + prediction markets + cross‑chain + agent wallet Plugin per protocol (extensible) EVM swap + on‑chain + Base‑native Wallet + LLM bridge Image gen + LLM marketplace
Custody model User‑sovereign default + bounded agent EOA with admin policy gate User‑sovereign User wallet (CDP) or smart wallet MetaMask signs everything N/A (no signing)
Mainnet safety Mandatory acknowledgeMainnet: true + audit‑before‑deploy gate Per‑plugin Default mainnet MetaMask UI confirmation N/A
AI enrichment DexScreener + GoPlus + News + AI signal composed into one call None native None native None native Image + LLM only
Cost transparency Per‑tool credit costs surfaced; mock server free LLM tokens only Gas only Gas only Per‑model
Solidity codegen + audit Native (chaingpt_generate_contract + chaingpt_audit_contract) No No No No
Prediction markets Polymarket native No No No No
Perps Hyperliquid (signed) + Drift (read) Add‑on No No No
Test harness 6 layers + daily live smoke Per‑plugin Examples only Snap testing None
License MIT MIT Apache‑2 MIT Various

Where this wins: breadth (129 tools), AI‑enriched composed tools (the DexScreener + GoPlus + News + AI signal combo), mainnet safety guard rails, and the agent‑wallet admin dashboard.

Where Goat / AgentKit win: if you want pluggable per‑protocol extensions over a fixed core surface, Goat's plugin model is cleaner. If you're Coinbase‑native (CDP, Base, Smart Wallet end‑to‑end), AgentKit is the obvious choice.

These aren't mutually exclusive — you can run this skill alongside any of them in Claude Code.


🗂️ Project structure

Click to expand
chaingpt-claude-skill/
├── .claude-plugin/
│   └── plugin.json                   # Plugin manifest (name, version, author)
├── .mcp.json                         # MCP server configuration
├── VERSION                           # Semantic version
├── README.md                         # This file
├── CONTRIBUTING.md
├── CHANGELOG.md
├── TESTING.md                        # Testing guide — six-layer harness
├── LICENSE
│
├── skills/                           # 22 sub-skills (auto-discovered)
│   ├── chaingpt/SKILL.md             #   Main skill — API reference + tool routing
│   ├── agent-wallet/SKILL.md         #   AI's own EOA with admin policy gate
│   ├── bridge/SKILL.md               #   Across cross-chain
│   ├── debug/SKILL.md                #   Troubleshoot API errors
│   ├── defi/SKILL.md                 #   Aave + Lido + EigenLayer + Pendle + Morpho
│   ├── deploy/SKILL.md               #   Mainnet contract deployment
│   ├── drift/SKILL.md                #   Drift perps on Solana (read-only)
│   ├── hackathon/SKILL.md            #   60-second project scaffolder
│   ├── hyperliquid/SKILL.md          #   Hyperliquid perps
│   ├── playground/SKILL.md           #   Interactive API testing
│   ├── polymarket/SKILL.md           #   Polymarket prediction markets
│   ├── research/SKILL.md             #   Token research + DexScreener
│   ├── security/SKILL.md             #   Honeypot + risk + audit
│   ├── aa/SKILL.md                   #   ERC-4337 v0.7 account abstraction
│   ├── base/SKILL.md                 #   Basenames + Base Mini Apps
│   ├── dashboard/SKILL.md            #   Localhost marketplace dashboard
│   ├── solana/SKILL.md               #   Solana signing foundation + transfers
│   ├── strategy/SKILL.md             #   Plan persistence + backtest
│   ├── trade/SKILL.md                #   OpenOcean / 1inch / CoW / Jupiter
│   ├── trustless-agents/SKILL.md     #   ERC-8004 agent identity/reputation
│   ├── x402/SKILL.md                 #   x402 agentic payments (HTTP 402)
│   └── update/SKILL.md               #   Check for skill updates
│
├── reference/                        # API & SDK documentation (19 files)
├── templates/                        # 10 project templates (+ composition guide)
├── patterns/                         # 45+ Solidity patterns (6 files)
├── migration/                        # Platform migration guides (3 files)
├── mcp-server/                       # MCP server — 129 tools, 347 vitest cases
├── mock-server/                      # Mock API for zero-credit dev — 26 tests
├── scripts/                          # validate.sh + test-all.sh + demo launcher
└── examples/                         # Working code — JS + Python

🗺️ Roadmap

Shipped (1.0 → 1.9)

  • Complete API reference for all 7 ChainGPT products
  • 129 MCP tools across ChainGPT AI, EVM + Solana DEX (OpenOcean · 1inch v6 · CoW · Jupiter), DeFi (Aave · Lido · EigenLayer · Pendle · Morpho), perps (Hyperliquid · Drift), prediction markets (Polymarket), cross‑chain (Across), Solana lending (Marginfi · Kamino), multi‑protocol portfolio snapshot, strategy plan persistence + backtest
  • Agent wallet — encrypted keystore + prompt‑injection‑resistant admin policy gate + localhost admin dashboard (assets / policy / activity / settings tabs, kill switch, 9 policy templates including 🚨 unrestricted)
  • Custody‑free signing — every state‑changing tool returns an unsigned tx / EIP‑712 intent; the plugin never sees a private key. acknowledgeMainnet: true gate on every mainnet write
  • 10 project templates including multi‑product compositions
  • 45+ audited Solidity patterns
  • Mock server for zero‑credit development (26 endpoint tests)
  • Unified test harness./scripts/test-all.sh runs six layers. 347 vitest + 26 mock + 159 validate + 39 live‑API cases
  • Daily live‑API smoke CI — catches upstream drift within 24h, opens a labeled GitHub issue on failure
  • Migration guides (OpenAI, Alchemy, custom)
  • Cost optimization & wallet integration docs
  • ERC‑4337 v0.7 foundation — userOpHash, PackedUserOperation packing, bundler‑RPC proxy. 4 MCP tools. Per‑provider session‑key issuance (Safe / Kernel / Biconomy / Alchemy SW) queued as follow‑ups.
  • SSE streaming demoexamples/sse/ wraps the General Chat stream as Server‑Sent Events with a browser EventSource client.
  • Multi‑language SDK examples (Go, Rust)examples/go/ (stdlib only) + examples/rust/ (reqwest blocking + serde + rustls) calling the public API gateway.

In review (open PRs)

  • CI protective gates (PR #29) — solidity pattern compilation, MCP boot smoke, version consistency. Adds two CI jobs; six → eight test layers.
  • Solana signing foundation (PR #30) — custody‑free VersionedTransaction builder + native SOL + SPL transfer tools. +2 tools, +29 tests. Drift/Marginfi/Kamino signed actions queued as follow‑up PRs that layer on this.

Next up

  • Drift / Marginfi / Kamino signed actions — bring each from read‑only to signed execution on top of PR #30's Solana foundation
  • Per‑provider ERC‑4337 session‑key issuance — Safe, Kernel (ZeroDev), Biconomy, Alchemy SW on top of the foundation already shipped
  • Claude Code plugin marketplace listing
  • Video tutorials & walkthroughs
  • Community template submissions

🤝 Contributing

Contributions are welcome! See CONTRIBUTING.md for guidelines.

# Validate your changes before submitting
bash scripts/validate.sh

📄 Prerequisites

Requirement Link
ChainGPT API Key app.chaingpt.org — connect a wallet to sign up
API Credits Buy credits — 1,000 credits = $10
Claude Code code.claude.com

🔗 Links


📜 License

MIT — see LICENSE for details.


Built by ChainGPT — AI Infrastructure for Web3

If this skill saved you time, consider giving it a ⭐

Reviews (0)

No results found