qai-consultant

mcp
Security Audit
Warn
Health Warn
  • License — License: NOASSERTION
  • Description — Repository has a description
  • Active repo — Last push 0 days ago
  • Low visibility — Only 5 GitHub stars
Code Pass
  • Code scan — Scanned 12 files during light audit, no dangerous patterns found
Permissions Pass
  • Permissions — No dangerous permissions requested

No AI report is available for this listing yet.

SUMMARY

AI-powered QA Architect agent — generates ISTQB/OWASP/IEEE/ISO-grounded Test Strategies, Risk Registers, Effort Estimates & Test Plans via RAG. Cloud-hosted (Mistral API + Pinecone).

README.md

QAI Consultant

QAI Consultant

An open-source AI agent that acts as a senior QA Architect — automatically generating a Test Strategy, Risk Register, Effort Estimation Report, and Test Plan from a simple project description, plus deterministic QA Document Quality Review, Test Results Analysis, and QA Maturity Assessment for evaluating what already exists. Also available as a local MCP server so Claude Code, Claude Desktop, and other MCP clients can ground their own QA work in the same standards and numbers.

🌐 Live demo: quality-ai-consultant.streamlit.app

🔌 MCP server: uvx qai-consultant-mcp — no API keys, no Pinecone. See MCP Server below or the package on PyPI.

🤖 Built with Claude Code by Anthropic.

CI
License
Python
Version
PyPI
Built with Claude


Screenshots

Web UI (Streamlit)

Landing page
Streamlit landing page

MCP panel in the sidebar
Streamlit MCP panel in the sidebar

Project Discovery dialogue (Web Application template applied)
Streamlit Project Discovery dialogue

Executive Readout + generation status
Streamlit Executive Readout above the output tabs

Risk Register (Risk Ledger table)
Streamlit Risk Register tab

Effort Estimation
Streamlit Effort Estimation tab

Test Strategy
Streamlit Test Strategy tab

Test Plan
Streamlit Test Plan tab

QA Document Quality Review
Streamlit QA Document Quality Review

QA Maturity Assessment
Streamlit QA Maturity Assessment

CLI

CLI Banner
CLI Project Discovery dialogue


Quick Start

Option A — Use the live app (no setup)

👉 quality-ai-consultant.streamlit.app

Option B — Run locally

# 1. Clone and install
git clone https://github.com/gvasile29/qai-consultant.git
cd qai-consultant
pip install -r requirements.txt

# 2. Set up API keys
cp .env.example .env
# Edit .env and fill in the 4 keys (see Prerequisites below)

# 3. Build the knowledge base (one-time, pushes to Pinecone)
python src/ingest.py

# 4. Run
python src/cli.py            # Terminal UI
streamlit run src/app.py     # Web UI → http://localhost:8501

📖 Full installation guide: INSTALL.md


The Problem

Creating a Test Strategy from scratch is time-consuming and requires deep QA expertise. Most teams either skip it, do it superficially, or spend days researching methodologies.

QAI Consultant eliminates this bottleneck by combining established QA methodologies, industry standards (ISTQB, OWASP, ISO 26262, A-SPICE), and expert knowledge into an AI agent that thinks like a seasoned QA Architect.


Who Is This For?

  • QA Engineers who need structured guidance on test strategy
  • Engineering Managers who need effort estimations and resource planning
  • Development teams without a dedicated QA Architect
  • QA Consultants who want to accelerate their delivery

What QAI Consultant Generates

From a single 11-question dialogue, QAI Consultant automatically generates four documents:

Document What it contains
⚠️ Risk Register Risk matrix, likelihood/impact analysis, mitigations per risk
📊 Effort Estimation Report PERT-based breakdown, team capacity analysis, confidence score
📋 Test Strategy ISTQB-aligned strategy tailored to your stack, methodology, and compliance
📝 Test Plan IEEE 829-aligned plan with entry/exit criteria, schedule, and AI tool oversight

Above the four tabs, an Executive Readout summarizes overall risk, the QA effort range, team capacity, confidence, and the top 3 risks — computed deterministically from the Risk Register and Effort Estimation, with no extra LLM call.

All outputs are saved as Markdown files and available for PDF download.

Evaluating what already exists (deterministic, no LLM needed for the scores):

Mode What it does
📝 QA Document Quality Review Scores an existing Test Plan / Strategy / test case list 0–100 across six ISTQB/IEEE 829 dimensions, with findings and knowledge-base citations
🧪 Test Results Analysis Flaky, ever-failing, never-run and slowest tests plus failure clustering from JUnit XML/CSV — optionally used to ground the Risk Register in real execution data
📈 QA Maturity Assessment Indicative TMMi level (1–3) across 10 process areas from a free-text description, plus an EU AI Act Articles 9–15 readiness check for AI/ML systems

Knowledge Base

QAI Consultant's recommendations are grounded in real QA standards and methodologies:

  • 📘 ISTQB — 14 certification syllabuses (CTFL, CTAL-TA, CTAL-TM, CTAL-TAE, CT-AI, and more)
  • 🔒 OWASP — WSTG v4.2, MASTG, Top 10 2021
  • 🚗 ISO 26262 — Automotive functional safety (ASIL levels, HARA, V&V)
  • 🏭 A-SPICE — Automotive SPICE process reference model (SWE.4, SWE.5, SWE.6)
  • 📋 IEEE 829 — Test documentation standard
  • ⚙️ ISO/IEC 25010 — Software product quality model
  • 🇪🇺 EU AI Act — risk tiers, provider/deployer obligations, Article 50 transparency, Articles 9–15 testing implications
  • 🧭 Testing methodologies — Agile, BDD/TDD, exploratory, risk-based testing, test pyramid
  • 🔍 Audit & process evaluation — TMMi, CMMI, ISO/IEC 33002, ISO 19011, OWASP ASVS, ISO 27001, SOC 2, plus public failure case studies (Knight Capital, Boeing 737 MAX MCAS, CrowdStrike 2024)
  • 🤖 AI Test Planning — 17 real-world AI SDLC case studies (2024–2025)
  • 🧠 Expert Knowledge — Real QA scenarios and lessons learned from practitioners

Prerequisites

QAI Consultant runs on cloud APIs — no local GPU required.

You need four API keys in a .env file (all have free tiers):

Key Where to get it
MISTRAL_API_KEY console.mistral.ai → API Keys (the default model, ministral-14b-2512, works on Mistral's free plan)
OPENROUTER_API_KEY openrouter.ai/keys (fallback; uses free models only)
PINECONE_API_KEY pinecone.io → API Keys
PINECONE_INDEX_NAME Name of your Pinecone index (e.g. qai-consultant, dimensions: 384, metric: cosine)
cp .env.example .env
# Edit .env and fill in all four values

Architecture

QAI Consultant Architecture

How It Works

You describe your project (11 questions)
        ↓
QAI retrieves relevant knowledge from Pinecone (parallel RAG, 3 threads)
        ↓
QAI analyzes risks from your context → Risk Register (Mistral API)
        ↓
QAI estimates effort using PERT + industry benchmarks → Effort Report
        ↓
QAI summarizes risk, effort, capacity and top risks → Executive Readout (no LLM)
        ↓
QAI generates a Test Strategy backed by QA standards → Test Strategy (Mistral API)
        ↓
QAI generates an IEEE 829-aligned Test Plan → Test Plan (Mistral API)
        ↓
Four documents ready for Markdown + PDF download

LLM calls use the Mistral API (ministral-14b-2512) as the primary provider, with OpenRouter free models (Nemotron 3 Super → GLM 5.2) as automatic fallback.


Interfaces

Web UI (Browser — recommended)

streamlit run src/app.py

Or use the live hosted version: quality-ai-consultant.streamlit.app

Besides the Test Strategy flow, the landing page and sidebar offer Review an existing QA document and Assess QA Maturity; test execution results can be attached on the review screen before generating.

CLI (Terminal)

python src/cli.py                                   # interactive Test Strategy flow
python src/cli.py --results run1.xml run2.xml       # same flow, grounded in JUnit XML/CSV results
python src/cli.py --review path/to/test_plan.md     # QA Document Quality Review
python src/cli.py --maturity path/to/process.txt    # QA Maturity Assessment

MCP Server (for Claude Code, Claude Desktop, and other MCP clients)

qai-consultant MCP server
qai-consultant MCP server
MCP Registry
Awesome MCP Servers

Listed on the official MCP registry (io.github.gvasile29/qai-consultant-mcp), Glama, and Awesome MCP Servers.

QAI Consultant is also available as a local, fully keyless MCP server —
qai-consultant-mcp. No Pinecone, no Mistral/OpenRouter API keys: it runs a
local embedding index over the knowledge base's Markdown documents (the ISTQB and
OWASP PDFs are not bundled, for licensing reasons) and exposes deterministic QA
effort estimation, document review, test-results analysis and maturity
assessment, so your own AI assistant can ground its QA work directly, with no
separate LLM call. It runs locally over stdio (requires uv);
a hosted version connectable from claude.ai is on the roadmap (v4.0).

qai-consultant-mcp answering a retrieve_qa_knowledge call in MCP Inspector

uvx qai-consultant-mcp

Claude Code:

claude mcp add qai-consultant -- uvx qai-consultant-mcp

Claude Desktop (claude_desktop_config.json):

{
  "mcpServers": {
    "qai-consultant": {
      "command": "uvx",
      "args": ["qai-consultant-mcp"]
    }
  }
}

Tools:

Tool What it does
retrieve_qa_knowledge Grounding chunks from the KB (standards summaries — OWASP Top 10, IEEE 829, ISO/IEC 25010, ISO 26262, A-SPICE, EU AI Act — plus methodologies, audit/evaluation guides, and case studies), filterable by category
list_kb_sources Every document in the KB, grouped by category
estimate_qa_effort Deterministic PERT-based effort estimate (no LLM narrative — you write your own from the numbers)
review_qa_document Deterministic 0–100 quality score for an existing Test Plan/Strategy/test case list across six ISTQB/IEEE-829 dimensions, with findings + KB citations
analyze_test_results Deterministic health metrics from JUnit XML/CSV test execution data — flaky tests, ever-failing tests, slowest tests, failure clustering
assess_qa_maturity Deterministic indicative TMMi process-maturity level (1-3, never a certified 4-5) from a free-text description, plus a conditional EU AI Act Articles 9-15 readiness score when the input signals an AI/ML system

Prompts: qa_project_interview (the same 11-question intake this app uses), risk_register_structure, test_strategy_structure, test_plan_structure — each grounds the client's generation in retrieve_qa_knowledge with [Source N] citations.

Privacy: usage telemetry is off by default. Set QAI_TELEMETRY=1 to opt in; even then, only tool name/success/duration/category and an anonymous install ID are sent — never your query text or project details.


Feedback Loop

After each generation, QAI asks: "Was this strategy useful?"

  • Yes → strategy saved to knowledge_base/generated_strategies/ and included in the next re-ingestion
  • Partially → strategy saved with your improvement notes
  • No → discarded

This creates a feedback loop where QAI learns from validated real-world outputs over time.


Roadmap

  • v0.1 ✅ Core agent + CLI + Streamlit Web UI
  • v0.2 ✅ Feedback loop — validated strategies grow the knowledge base
  • v0.3 ✅ Risk Register — automatic risk analysis alongside Test Strategy
  • v0.4 ✅ Effort Estimation Report — PERT-based with team capacity analysis
  • v0.5 ✅ Auto re-ingest — file watcher + incremental ingest + manifest tracking (the file watcher was removed in v2.0)
  • v0.6 ✅ Confidence level algorithm — score-based (0-100): PERT spread + capacity gap + data quality + multiplier magnitude
  • v1.0 ✅ MVP — error handling, input validation, logging, full documentation, tests, Apache 2.0 license
  • v2.0 ✅ Cloud migration — Ollama → Mistral API + OpenRouter fallback; ChromaDB → Pinecone; deployed to Streamlit Cloud
  • v2.0.1 ✅ Stability — 27 bugs fixed: PERT normalization, template application, PDF caching, session state, filename sanitization, RAG fallback, per-step exception isolation
  • v2.0.2 ✅ Stability — release-gate evals (estimate integrity + RAG metrics), 5 estimation/validation defects fixed, session-state crash fix, narrative duplication/truncation fixes, per-step generation isolation from LLM outages
  • v2.5.0 ✅ In-app Release Notes — sidebar panel + one-time "what's new" banner
  • v2.5.1 ✅ Knowledge base — new evaluation_audit/ pillar: process/test maturity models, audit methodology, security/compliance audit, real public failure case studies
  • v2.5.2 ✅ EU AI Act Article 50 transparency patch — sidebar AI-interaction notice + visible "AI-generated content" label on every generated document
  • v2.6.0 ✅ EU AI Act knowledge base pillar — risk tiers, provider/deployer obligations, Article 50 transparency, Articles 9-15 testing implications, conformity assessment, timeline
  • v3.0.0 ✅ MCP server MVP — local, keyless qai-consultant-mcp (standards-grounded retrieval + deterministic effort estimation), in-app announcement, and machine-readable AI-generated marking (EU AI Act Article 50(2))
  • v3.1.0 ✅ Evaluation Package — QA Document Quality Review (deterministic ISTQB/IEEE-829 rubric scoring an existing Test Plan/Strategy/test case list, with an optional AI narrative) and Test Results Analysis (flaky/ever-failing/slowest/failure-clustering metrics from JUnit XML/CSV, grounding the Risk Register in real execution data); available in the web app, CLI (--review, --results), and the MCP server (review_qa_document, analyze_test_results)
  • v3.1.1 ✅ Visit counter — a running total of app visits now shows in the sidebar, persisted in Pinecone so it survives redeploys
  • v3.1.2 ✅ Fix — the 3.1.1 visit counter never actually incremented (Pinecone rejected its all-zero placeholder vector); now works correctly
  • v3.1.3 ✅ Fix — the visit counter's label was in Romanian ("vizite") instead of English; now reads "visits" to match the rest of the app's UI copy
  • v3.1.4 ✅ Added the mcp-name marker to README_MCP.md (PyPI long description) — a prerequisite for listing qai-consultant-mcp in the official Anthropic MCP registry; no functional change
  • v3.1.5 ✅ Fix — qai-consultant-mcp failed to start (ModuleNotFoundError: mcp.server.fastmcp) after the upstream mcp SDK's breaking 2.0.0 release removed the FastMCP module the server depends on; mcp is now pinned to >=1.8.0,<2.0.0
  • v3.1.6 ✅ Fix — qai-consultant-mcp could fail to attach in Claude Desktop on a cold cache (a client-side handshake timeout, since the server used to fully embed the whole knowledge base before responding to initialize); the full index build is now lazy, deferred until the first real request
  • v3.2 ✅ CI quality gates completion — a separate nightly workflow exercising real Pinecone/Mistral/OpenRouter contract tests, which never blocks a PR
  • v3.3 ✅ Adopted the EU's official AI-generated-content icon (Code of Practice, AI Act Article 50(4)) in the Streamlit sidebar and all generated-document PDF exports, reinforcing the existing text/metadata disclosure
  • v3.3.1 ✅ Fix — qai-consultant-mcp could intermittently fail to attach in Claude Desktop because 4 of its 6 runtime dependencies had loose version bounds, letting uv re-resolve and reinstall on any unrelated upstream release; all dependencies are now exact-pinned
  • v3.4 ✅ App visual redesign ("Calibration Bench") — token-based color/typography system (IBM Plex fonts, no font CDN) and a reusable "Signal Ledger" score/severity component, applied to Document Review, Effort confidence, Results Analysis, Risk Register, and the Project Discovery question list
  • v3.4.1 ✅ Distribution links (official MCP registry, Glama, Awesome MCP Servers) now shown in the app's own MCP panel, not just the READMEs; landing page redesign started (Phase 1 of 3 — see the CHANGELOG)
  • v3.4.2 ✅ Interactive flow redesign (Phase 2 of 3 — see the CHANGELOG): the Project Discovery dialogue, review screen, and sidebar now share the landing page's "Power-On Sequence" visual language (animated progress bar, one-time entrance-animated summary tiles, hover feedback)
  • v3.4.3 ✅ Output screens redesign (Phase 3 of 3, completing the "Power-On Sequence" redesign — see the CHANGELOG): the Test Strategy results view and the document review screen now share the same visual language (live 4-stage sequence status, entrance-animated score tiles, hover feedback), plus a "What you get in ~2 minutes" addendum on the landing screen
  • v3.4.4 ✅ Fix — qai-consultant-mcp could again fail to attach in Claude Desktop, this time from an unpinned transitive dependency (scipy, via scikit-learn) picking up a fresh release mid-cache-miss; the entire resolved dependency tree (~99 entries) is now exact-pinned, not just the 6 direct imports
  • v3.5.0 ✅ QA Maturity Assessment (assess_qa_maturity) — deterministic TMMi process-maturity signal (10 process areas, indicative level 1-3) plus a conditional EU AI Act Articles 9-15 readiness score for AI/ML projects; available in the web app ("📈 Assess QA Maturity"), CLI (--maturity), and the MCP server (assess_qa_maturity)
  • v3.5.1 Fix: QA Maturity scoring missed paraphrased evidence (requirement traceability described in prose, progress tracking described as "defect triage"/"pass rate") — found via live browser QA. Yanked from PyPI — see v3.5.2, published the same day, for why
  • v3.5.2 ✅ Fix: the v3.5.1 MCP package could not be installed at all (torch==2.13.0+cpu unresolvable from plain PyPI) — reverted to a plain torch==2.13.0 pin. This is the first working PyPI publish of the assess_qa_maturity MCP tool, since v3.5.0's own publish step was never completed and v3.5.1 was broken
  • v3.5.3qai-consultant-mcp's local index switched from sentence-transformers/torch to fastembed (ONNX Runtime) for embeddings — same retrieval quality (evals/local_index_parity.py: recall@5=0.91, MRR=0.86, unchanged), ~3x faster cold import, and a much smaller dependency list. Removed the weekly dependency-drift-canary workflow, no longer justified at the smaller scale. See CHANGELOG.md for details.
  • v3.5.4 ✅ Reliability fixes from the 2026-09-23 external audit: streaming no longer duplicates output when the primary LLM drops mid-response; the effort estimate's risk buffer now counts actual Risk Matrix rows (it was inflated to the 35% cap by keyword matches); confidence scoring no longer treats precise answers like "None" or "functional safety" as vague. See CHANGELOG.md.
  • v3.6.0 ✅ Public-app protection and an at-a-glance summary, from the 2026-09-23 external audit: server-side daily generation limits (a global daily cap plus a per-visitor cap, alongside the existing 3-runs-per-session cap) so opening a new tab no longer resets the quota; and an Executive Readout above the four output tabs — overall risk, QA effort range, team capacity, confidence, and the top 3 risks to address first — built deterministically from the Risk Register and Effort Estimation, with no extra LLM call. See CHANGELOG.md.
  • v3.6.1 ✅ The OpenRouter fallback now uses only free-tier models (Nemotron 3 Super → GLM 5.2, via OpenRouter's models fallback chain), so the fallback no longer accrues charges; an empty AI response now shows a clear error instead of an empty document; the in-app AI notice now warns that submitted text may be logged and used for training by the LLM providers. See CHANGELOG.md.
  • v3.6.2 ✅ Primary model switched to Ministral 14B (Mistral Small is rate-limited on Mistral's free plan), output budget raised to 6,500 tokens so documents are no longer cut off, and a bold Risk Matrix header no longer empties the Risk Ledger, Executive Readout and effort risk buffer
  • v4.0 Remote MCP — a hosted server connectable from claude.ai, plus server-side usage metrics

Contributing

QAI Consultant is built by the QA community, for the QA community.

Contributions are welcome:

  • 📚 Add new knowledge sources to knowledge_base/
  • 🧠 Share expert knowledge using the prompts in knowledge_base/expert_knowledge/
  • 🐛 Report bugs or suggest features via GitHub Issues
  • 🔧 Submit pull requests

See CONTRIBUTING.md for detailed guidelines.


Troubleshooting

Problem Solution
"Missing required secret: 'MISTRAL_API_KEY'" Add your key to .env or Streamlit Cloud secrets
"Missing required secret: 'PINECONE_API_KEY'" Add your Pinecone key to .env
"Knowledge base is empty" Run python src/ingest.py to push documents to Pinecone
"The AI providers are temporarily unavailable" Both Mistral and the OpenRouter free models failed — retry in a few minutes; logs/qai_consultant.log has the underlying error
Mistral returns 429 Rate limit exceeded (code 1300) at almost no usage On Mistral's free plan, Mistral Small/Medium are rejected while the Ministral models are served — keep the default ministral-14b-2512, or enable pay-as-you-go before switching MISTRAL_MODEL

📖 Full troubleshooting guide: INSTALL.md