SUMMARY

A Bun CLI that ingests Claude Code and Codex session transcripts, generates LLM-powered daily summaries, and serves a browsable web UI for your engineering journal.

README.md

Engineering Notebook

A CLI tool that ingests Claude Code and Codex session transcripts, generates LLM-powered daily summaries, and serves a web UI for browsing your engineering journal.

Think of it as an automatic engineering diary — it watches your AI coding sessions and distills them into a searchable, browsable narrative of what you built, what problems you hit, and what decisions you made.

Journal view — three-panel layout with date index, entry detail, and conversation transcript

How It Works

  1. Ingest — Scans directories of Claude Code and Codex JSONL session files, parses out the human-readable conversation (stripping tool calls, thinking blocks, etc.), and stores them in SQLite.
  2. Summarize — Groups sessions by date and project, then uses Claude to write concise engineering journal entries with headlines, summaries, topics, and open questions.
  3. Serve — Runs a web server with a browsable UI: daily journal, project timelines, calendar/Gantt view, session transcripts, full-text search, and an iCal feed.

Install

Requires Bun v1.1+.

git clone https://github.com/prime-radiant-inc/engineering-notebook.git
cd engineering-notebook
bun install
bun link  # makes `engineering-notebook` available globally

Quick Start

# 1. Ingest your sessions (defaults to ~/.claude/projects and ~/.codex/sessions)
engineering-notebook ingest

# 2. Generate journal summaries (requires ANTHROPIC_API_KEY)
engineering-notebook summarize --all

# 3. Browse your journal
engineering-notebook serve
# Open http://localhost:3000

Web UI

The web interface has several views:

  • Journal — Three-panel layout: date index, entries for the selected date, and entry detail with full conversation transcripts. Entries include headlines, summaries, topic tags, and open questions.
  • Projects — Browse all projects sorted by recency. Each project shows a timeline of journal entries with on-demand summarization for new sessions.
  • Calendar — Week and month views with Gantt-style bars showing project activity across dates. Days link back to the journal view.
  • Search — Full-text search across journal entries and conversation transcripts with highlighted results.
  • Settings — Configure sources, exclusions, remote sources, summary instructions, auto-sync interval, and day start hour. Includes an iCal feed URL for subscribing in your calendar app.
Calendar/Gantt view Search with highlighted results
Calendar/Gantt view Full-text search

Each session transcript includes a resume command (claude --resume <id>) with a copy button for picking up where you left off.

Usage

engineering-notebook ingest

Scan source directories and ingest session files into the database.

engineering-notebook ingest                    # scan default sources
engineering-notebook ingest --source ~/extra   # add an extra source directory
engineering-notebook ingest --force            # re-ingest already-processed sessions

engineering-notebook summarize

Generate LLM summaries for ingested sessions.

engineering-notebook summarize --all                      # summarize everything unsummarized
engineering-notebook summarize --date 2026-02-22          # summarize a specific date
engineering-notebook summarize --project myapp            # summarize a specific project
engineering-notebook summarize --date 2026-02-22 --project myapp  # both filters

engineering-notebook serve

Start the web server.

engineering-notebook serve              # default port 3000
engineering-notebook serve --port 8080  # custom port

The server auto-syncs remote sources and re-ingests on a configurable interval (default: 60 seconds).

Configuration

Config lives at ~/.config/engineering-notebook/config.json:

{
  "sources": ["~/.claude/projects", "~/.codex/sessions"],
  "exclude": ["-private-tmp*", "*-skill-test-*"],
  "db_path": "~/.config/engineering-notebook/notebook.db",
  "port": 3000,
  "day_start_hour": 5,
  "summary_instructions": "",
  "remote_sources": [],
  "auto_sync_interval": 60
}
Field Description Default
sources Directories to scan for session files ["~/.claude/projects", "~/.codex/sessions"]
exclude Glob patterns for directories to skip ["-private-tmp*", "*-skill-test-*"]
db_path SQLite database location ~/.config/engineering-notebook/notebook.db
port Web server port 3000
day_start_hour Hour (0-23) when a "day" starts (for grouping late-night sessions with the previous day) 5
summary_instructions Custom instructions appended to the LLM summarization prompt ""
remote_sources SSH remote sources to sync before ingesting []
auto_sync_interval Seconds between auto-syncs when serving 60

Remote Sources

Sync session files from remote machines over SSH:

{
  "remote_sources": [
    {
      "name": "workstation",
      "host": "work.local",
      "path": "~/.claude/projects",
      "enabled": true
    }
  ]
}

iCal Feed

When the server is running, subscribe to the iCal feed at:

webcal://localhost:3000/api/calendar.ics

This creates calendar events for each journal entry, viewable in Apple Calendar, Google Calendar, Outlook, etc.

Development

bun install
bun test          # run tests
bun src/index.ts  # run from source

Tech Stack

  • Bun — runtime, bundler, test runner, SQLite
  • Hono — web framework
  • Anthropic SDK — LLM summarization (Claude Haiku)
  • HTMX — interactive web UI without a JS framework

License

Apache 2.0 — see LICENSE.